Skip to content

Kitchen remodeling in Orlando

Demolition, plumbing, electrical, cabinets, countertops and finishes, with one company responsible and the permit pulled.

In almost every kitchen we open, there is old water under the sink cabinet.

Why it is urgent

What is happening in your property right now

A kitchen is not just another room: it concentrates the plumbing, the heaviest electrical load in the house and the only appliances plumbed to water. Open it up and everything that has been going on back there for years comes to light.

The usual find is old moisture under the sink cabinet, along the dishwasher line, or behind a refrigerator with a water dispenser. Nobody saw it because the cabinet covered it, and the floor underneath has been getting wet since before you bought the house.

That is where most remodels stall. The contractor finds mold, cannot treat it, and the job stops. Weeks disappear and a second estimate shows up that nobody planned for.

What it includes

The work, step by step

No fine print: this is exactly what we do, and in what order.

  1. Consultation and measuring

    We measure the actual space, not the one on the plans, and talk about how you use the kitchen before drawing anything.

  2. Written scope and estimate

    Materials, quantities and price, line by line. Without that on paper the work does not start.

  3. Permit

    If plumbing moves or the electrical panel gets touched, a permit is required. We pull it with your city or county.

  4. Demolition and whatever turns up

    This is where the surprises come out. If moisture appears, we deal with it without stopping the job.

  5. Plumbing and electrical

    Relocating supply, drain, circuits and outlets to suit the new layout, with county inspection.

  6. Cabinets and countertops

    Installed level and anchored. Countertops get templated after the cabinets are in, never before.

  7. Finishes and final inspection

    Backsplash, paint, hardware and appliances. We close the permit and hand you the paperwork.

Photo pending

Photo of a finished job for this service · horizontal, 2000 px wide minimum

Why us

Why choose us for kitchen remodeling

  • We are a restoration company as well as a contractor: if water or mold turns up when we open the wall, it gets handled inside the same job and the same contract.

  • The permit, the work and the inspection all sit with one company.

  • The scope goes in writing before we start, and if hidden damage appears it gets communicated before we continue, not on the invoice.

  • We live and work in this community. We are not a national franchise dispatching a crew from another state.

Warranty

What we stand behind in writing

  • Interior repairs

    1 year

  • Roofing work

    20 years

It covers our workmanship. Materials additionally carry their manufacturer's warranty, which is handed over with the job.

It does not cover new damage. If a problem shows up later from another cause — another storm, another leak, lack of maintenance, or work done by somebody else — that is a separate loss and gets handled as one.

The term that applies to your job is put in writing in the service agreement before work starts.

Frequently asked

What people ask us most

If your question is not here, call us and we will answer it on the phone, no obligation.

How long does a kitchen remodel take?

The work itself usually runs three to six weeks. What really drives the calendar is not us: it is the lead time on cabinets and countertops, which have to be ordered ahead. That is why the order goes in as soon as the design is approved.

Do I need a permit to remodel a kitchen?

It depends on the scope. Swapping cabinets and countertops without moving anything usually does not require one; moving plumbing, adding circuits or touching the panel does. We check with your city before starting and pull it ourselves.

Can I use the kitchen while the work is happening?

Not during demolition or installation. Most people set up a temporary kitchen elsewhere in the house with the fridge and microwave. We tell you in advance which days you will be without a sink.

What if mold turns up when the cabinets come out?

It happens more than people expect. It gets contained, remediated and the job keeps moving — documented in writing and with photos.

What drives the cost of a kitchen up the most?

Moving the plumbing and rerouting the electrical. Keeping the sink where it is saves a good deal. After that it is countertops: the difference between materials is the line item that moves the estimate most.

24-hour emergency service, 7 days a week

Every hour that passes, the damage costs more

Call us and we will tell you on that same call what to do right now, even if you end up hiring someone else. The inspection is free and so is the advice.

  • Free inspection, no obligation
  • Our Team Is Here to Assist You in English & Spanish
  • Licensed and insured in the State of Florida

We serve Windermere, Winter Park, Lake Nona, Dr. Phillips, Bay Hill, Golden Oak, Bella Collina, Montverde, Heathrow, Lake Mary, Longwood, Maitland, Celebration, Winter Garden, Horizon West and the rest of Central Florida.

Call nowFree inspection